|
Performance of SAP-Primavera Integration |
|
|
|
|
Written by Administrator
|
|
This does of course depend on the vendor. Synchronizing data between SAP and Primavera uses a lot of 'moving parts' (i.e., hardware, network, operating system, SAP JCO, SAP API, Primavera API, Java code). In general it should be reasonable to expect that the download of 10,000 activities from SAP into Primavera with one resource assignment, a handful of standard fields, and about 20 UDFs or Activity Codes in Primavera will require less than 1 hour (60 minutes).
|